Switching Orders

Ordered Switching, Executed Step by Step

Author switching orders as a precise sequence of operations, then execute them with per-step verification. Every action — open, close, ground, test — is recorded against the responsible operator and the affected network device, so the executed order is a defensible record of exactly what happened on the system.

  • Step-by-step switching sequences with device-level targeting
  • Execution tracking with per-step sign-off
  • Automatic linking to LOTO and permits for the same work
  • Full audit trail of who did what, and when
Switching Order #SW-2026-0418
Open breaker CB-214 (Feeder 4)
J. Okafor · 09:14
Rack out CB-214 to TEST
J. Okafor · 09:18
3
Apply grounds at GS-214
In progress · awaiting LOTO
4
Voltage test & verify de-energized
Pending
Lockout / Tagout (LOTO)

Every Energy Source, Accounted For

Lockout/tagout is where life-safety lives. GridState enforces a complete LOTO lifecycle — isolate every energy source, apply locks and tags, verify zero energy, and release only through an authorized, sequenced removal. No lock is released until every isolating device is reconciled.

  • Per-energy-source isolation with lock & tag records
  • Zero-energy verification step before work begins
  • Authorized, sequenced lock removal and release
  • OSHA 1910.147-aligned workflow
LOTO Status — Substation Springdale
Locks Applied
6
Energy Verified
Tags Active
4
Authorized By
M. Alvarez

Permits & Pre-Job Briefing

Switching and LOTO sit inside a broader work-control framework that keeps crews safe and informed before any device is touched.

📋

Work Permits

Full permit lifecycle — request, review, approval, issue, and closure — with permit-to-work conditions and validity windows.

👥

Safety Briefing

A unified pre-job view that consolidates the switching order, LOTO status, and active permits into one briefing crews sign before starting.

🔗

Linked Work Records

Every switching step, lock, tag, and permit is cross-linked to the same work package — no isolated, contradictory records.

📝

Defensible Audit Trail

Immutable, time-stamped records of each operation and authorization for incident review and regulatory scrutiny.

Make Every Switch Auditable